The house is built on a sloping site in Oakleigh. Installed 3 retaining walls. Between retaining walls the
distance is 1-1.5 meters. Water enters the house through these walls. It is necessary to carry out external
waterproofing of  the wall. The situation is further complicated by limited space.
However, “You never know what you can do till you try.” 
Waterproofing wall

Waterproofing Melbourne | Internal Wall Waterproofing | Damp Proofing | Rising Damp | Waterproofing Rising Damp
| Internal Waterproofing | Lateral Damp | Garage Waterproofing | AWC Group| Penetrating Damp | Crack Injection |
External Waterproofing | External Wall Waterproofing

Waterproofing Wall
Waterproofing Wall
The soil has been dug up. The wall is plastered. Very often, due to time and water, plaster comes away
from the wall,becomes chipped and bubbles. Applying a waterproofing membrane over such plaster is a
waste of money and labor. Therefore, we remove the existing plaster from the wall using a grinder down
to bare brick. After this we wash the wall with a pressure washer.
Wall waterproofing
Wall waterproofing
After preparing the wall in this way, we can perfectly see all the problem areas through which water
penetrates inside.
Wall waterproofing
Wall waterproofing
Wall waterproofing
Wall waterproofing
As always, the weakest point is the junction of the foundation and the wall.  We form a 45* angle fillet at
corners between the foundation and the wall with  rapid-setting cementitious compound Sika Plug –
(Fast Setting Water Plug) 
Wall waterproofing

Waterproofing Melbourne | Internal Wall Waterproofing | Damp Proofing | Rising Damp | Waterproofing Rising Damp
| Internal Waterproofing | Lateral Damp | Garage Waterproofing | AWC Group| Penetrating Damp | Crack Injection |
External Waterproofing | External Wall Waterproofing

Wall waterproofing
Wall waterproofing
During excavations, it turned out that the soil was very wet. Moreover, the deeper it is, the wetter it is. This
gave grounds to believe that water does not penetrate into the ground from above. Water flows down the
hills in the earth’s thickness.
Therefore, we decided to install an AGI pipe below the Foundation-Wall joint. A scoria base was created
under the pipe for filtration.
Wall waterproofing
Wall waterproofing
Backfilling is carried out with layer-by-layer compaction of the soil (every 100mm).
And finally, at the end of the work, our branded “After is better than Before”
We clean up after ourselves thoroughly.
Wall waterproofing
Wall waterproofing
Wall waterproofing

Waterproofing Melbourne | Internal Wall Waterproofing | Damp Proofing | Rising Damp | Waterproofing Rising Damp
| Internal Waterproofing | Lateral Damp | Garage Waterproofing | AWC Group| Penetrating Damp | Crack Injection |
External Waterproofing | External Wall Waterproofing