View our projects below

Mooroolbark College.

 

Mooroolbark College Crack Stitching

Repair of cracks in brickwork with matching mortar to existing.

 Crack Stitching.

Council House. Little Collins Street, The City.

 

101

External wall waterproofing.

Multi-Level Car Park on Elizabeth St, The City.

 

Multi-level Parking Crack Injection

Repair of concrete cracks - Concrete Crack Injection.

 

 

Mount Waverley Secondary College.

Rising Damp

Treatment of Rising Damp - Installation of Damp Proof Course.

Scotch College. Hawthorn.  Founded in 1851.

Scotch Collage

            Treatment of Rising Damp - Installation 120m of Damp Proof Course.

Anytime Fitness Doncaster.

Lift_Shaft_Waterproofing_Melbourne

Lift pit waterproofing.

The building in Richmond recognized as a

historical heritage, was constructed in 1857.

Owned by the Anglican Archdiocese of Melbourne.

 

 

Repair of cracks in a brick wall

Repair of cracks in brickwork  with matching mortar to existing.

Crack Stitching.

Office of Member of Parliament.

Customer is Department of Parliamentary Services -

Parliament of Victoria.

Rising Damp

Treatment of Rising Damp - Installation of Damp Proof Course.

Warehouse/office complex in Tullamarine.

Rising Damp

Waterproofing of the outer wall of the complex 200 m long.

High pressure injection with Hydrophilic Polyurethane Injection Resin.

Complete Shopfitters.

The Australian leaders in large-scale retail fittings and contract joinery design, manufacture and installation.

Damp Course

Waterproofing of the outer wall of the shop of a joinery manufacture 70 m long.

High pressure injection with Hydrophilic Polyurethane Injection Resin.

Application of our branded "Triple Protection".

 

Selection Steel

is a one of the largest Australian steel and building industries company. Melbourne Representative Office.

Epoxy Injection

Epoxy Crack Injection.

Excelsior House.  Built in 1884. Elizabeth St-Flinders St.  17-19 Elizabeth St, The City.

Lift pit waterproofing

Lift Pit Waterproofing.

The nine-storey tower at 411 Collins Street, The City

built in the 1930s and now home to the head office of

Chinese e-commerce giant Alibaba.

Waterproofing Melbourne

Waterproofing of basement rooms.

Kilvington Grammer School. Private School. Ormond.

Rising Damp

Treatment of Rising Damp - Installation 80m of Damp Proof Course.

Brunswick Secondary College

IMG 2442 scaled
IMG 2440 scaled

The building was built in 1897.

Treatment of Rising Damp - Installation 180m of Damp Proof Course.

Preston West Primary School

Rising Damp
Rising Damp

The building was built in 1915.

Treatment of Rising Damp - Installation 75m of Damp Proof Course.

The wall thickness is 4 bricks -18.5'' (470mm).

Malvern Primary School

Rising Damp
Rising Damp

Malvern Primary School was founded in 1884.

Treatment of Rising Damp – Installation 40m of Damp Proof Course.